5.1 GENERATION
C.S.E.B is having 1786 MW of Thermal Power and 137.85 MW of Hydel Power Plants
THERMAL POWER STATION
1.0 KORBA EAST THERMAL POWER STATION ( 4 X 50 MW + 2 X 120 MW )
|
Power Generation : Korba East |
Korba East TPS is located at the East Bank of River Hasdeo and near Balco Aluminium Factory having Installed capacity of 440 MW. The various units of the Power Station were commissioned on dates given below :
| |||||||||||||||
The above units were de-rated to 40 MW w.e.f. 01/01/1990 by Central Electricity Authority (CEA). Refurbishment work of all the units has been completed. After completion of the work, the capacity of the 40 MW units has enhanced to 50 MW. Dates of re-commissioning after refurbishment are as follows:
| Unit 1 ( 50 MW ) | - | 03/03/2004 |
| Unit 2 ( 50 MW ) | - | 12/09/2002 |
| Unit 3 ( 50 MW ) | - | 09/12/2002 |
| Unit 4 ( 50 MW ) | - | 03/10/2003 |
| Power House - III | ||
| Unit 5 ( 120 MW ) | - | 24/03/1976 |
| Unit 6 ( 120 MW ) | - | 05/04/1981 |
The load on these units was restricted to 90-95 MW due to various problems in Boiler side and design deficiencies. Refurbishment of these units has been completed and the units are running normally at 110 to 115 MW load. The dates of re-commissioning after refurbishment are as follows.
| Unit 5 ( 120 MW ) | - | 03/03/2005 |
| Unit 6 ( 120 MW ) | - | 08/10/2003 |
No.20-01/07/1928 Dtd.
02.0 KORBA EAST EXTENSION THERMAL POWER STATION ( 2 X 250 MW )
|
|
Korba East Extension TPS is located at the East Bank of River Hasdeo . The various units of the Power Station were commissioned on dates given below
| |||||||||
3.0 KORBA WEST THERMAL POWER STATION ( 4 X 210 MW )
|
Power Generation : Korba West |
Korba West TPS is located by the side of Hasdeo Barrage. The various units of the Power Station were commissioned on following dates as given below -
| |||||||||||||||||||||
CO- GENERATION POWER STATION
The units of co generation kawardha Power Station ( 1 x 6 MW ) was commissioned on dated 10.08.2006
HYDEL POWER STATION
1.0 HASDEO BANGO HYDEL POWER STATION ( 3 X 40 MW )
The units of Hasdeo Bango Hydel Power Station were commissioned during 1994-1995. The date of commissioning of units are given as below -
| Unit 1 ( 40 MW ) |
- |
21/03/1994 |
| Unit 2 ( 40 MW ) | - | 21/11/1994 |
| Unit 3 ( 40 MW ) | - | 11/01/1995 |
2.0 GANGREL HYDEL POWER STATION ( 4 X 2.5 MW )
The units of 4x2.5 MW Hydel power Station Gangrel were commissioned during 2004-05. The date of commissioning of units are given below:-
|
||||||||||||||
3.0 SIKASAR HYDEL POWER STATION ( 2 X 3.5 MW )
The units of 2x3.5 MW Hydel power Station Sikasar were commissioned during 2006-07. The date of commissioning of units are given below:-
|
||||||||